Honduras’ Empresa Nacional de Energía Eléctrica (ENEE) is to instal Elster’s EnergyAxis system in a 35,000 smart meter deployment beginning in December.

The installation is aimed at both residential and commercial and industrial customers and is aimed at reducing non-technical losses and dealing with delinquent accounts.

The installation will include the urban area of San Pedro Sula in northwest Honduras as well as smaller sites in the urban areas of Tegucigalpa in the south and La Ceiba in the Atlantic region, and is expected to be completed within six months.

www.enee.hn / www.elsterelectricity.com