ADD GRUP’s distributor in Sweden, TC Connect signed a new contract for the installation of an AMI project based on MV communications. The deal was concluded with Harryda Energi, the utility located in Harryda municipality, near to Gothenburg. The project counts 11500 metering points (mainly three-phase) and will cover the whole area network of Harryda Energi.

The installation of the system is planned for the autumn of 2007.